Honnington Farm – Case study

The second case study video created for Fair Energy features a 200KW bio mass boiler installation on Honnington Farm in Kent. This video features an interview with the owner and features footage of the completed installation.

[vimeo 44867369 640 360]

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *